Русская версия

Search document title:
Content search 1 (fast):
Content search 2:
ENGLISH DOCS FOR THIS DATE- Routine 3N, Proper Programing, Fast Blowing RIs - B630520 | Сравнить

CONTENTS ROUTINE 3N
PROPER PROGRAMING
FAST BLOWING RIs
FAST BLOWING RIs
Cохранить документ себе Скачать
HUBBARD COMMUNICATIONS OFFICE
Saint Hill Manor, East Grinstead, Sussex
HCO BULLETIN OF 20 MAY 1963
Central Orgs Missions

ROUTINE 3N
PROPER PROGRAMING
FAST BLOWING RIs

The proper programing for the HELOTROBUS IMPLANTS (in the 40 trillions ago) which contain “Heaven” is:

  1. Locate the goal To Forget and its top RIs to confirm that pc is native to this galaxy and has the implants. (Probably 95% of Scientologists do).
  2. Date the first series. Find out if there is a second, third, fourth series. Date these.
  3. Find out but do not run the type of overt pc has that keyed these implants in.
  4. Move pc back to first contact with the implanters (talking radioactive clouds or theta traps or whatever is basic on the chain). Get just before the first one by finding when pc has no electronic somatics as you date. (Hear tape demonstration of Wednesday, l5th May 1963 for exact patter.)
  5. Lightly run first contact (not first capture) or whatever is basic on the chain. Don’t go through it more than twice. Run no other engrams between it and actual implants or bank may beef up.
  6. Run the “Vestibule RIs,” a plot of which will shortly be released, these being just before goal “To Forget.”
  7. Resume running goal To Forget by R3N.
  8. Continue to run the implants goal by goal from earliest to last of the first series (28 or 29 goals), using exactly consecutive progression. Don’t skip any goals or RIs! Get end RIs of first series.
  9. When first series completely run, return to earliest point found in (4) above and run all contacts with implanters including capture rapidly, leaving none undischarged.
  10. Return to end of first series and run all contact with implanters from end of first series to beginning of second series.
  11. Run second series.
  12. Run pc’s overt engrams related to implanting.
  13. Proceed on through any remaining series of implants.

It is important not to run engrams if you can’t. You’ll just confuse the pc. And it’s important not to run engrams hard or through too many times before getting off the first series.

The implants are important. They are the charge that must be removed from the case. Three techniques are used to accomplish all this:

  1. Dating
  2. Engram running, modern style
  3. Routine 3N.

If you can’t do (1) and (2) then do only (3) and omit the balance of the program except Vestibule Implants, GPMs and End RIs.

The other actions of dating and engram running make it easier to run the implants.

But running the implants is the thing.

Less than three hours should be consumed in dating and other actions than finding RIs in the implants.

FAST BLOWING RIs

When a case has been properly programed as above, by the time you have run the first three or four goals, if you do them well with 3N, exactly on the form line plot, you will encounter a “difficulty.”

The RIs begin to discharge so fast that once the pc in session has said them, they do not again RR when the auditor says them. They have blown.

This will only happen when the pc’s visio has turned up well on the implant stairways, and the RRs are wide and free as the pc says them.

This changes none of the patter of R3N except saying something rocket read. One uses past tense of “read”: “That rocket read.”

I can visualize a pc flying up tone to where this happens and the auditor nagging because there’s no second read when the auditor calls it. How can it? It’s gone — blown.

By further rise in tone and with far more charge off, I can envision a pc racing along in session blowing RIs by inspection. Well, it’s observable when it happens that the whole of every RI’s charge is blowing. In such a case an auditor can further shorten the 3N patter in the interest of speed.

But realize that the auditor’s job, the auditor’s ethics demand, whatever the pc’s attitude, that THE AUDITOR’S JOB IS TO GET THE FULL CHARGE OFF EVERY RI.

L. RON HUBBARD
Founder